PERFORMANCE RECORD FOR MAJOR PROJECT



No.


Name of Project


Contract Period


Job Description


Client

1.

King Fahd Int'l. Airport (KFIA)
in Dammam

Dec. '89 -Jun. '91

  1. HVAC Duct Works
  2. Plumbing Works
  3. Halon Systems
  4. Electrical Works
  5. Testing & Commissioning

MODA / IAP
Sam Sung

2.

Long Range Radar, RSAF
in Qaisumah

Feb.'89-Aug. '89

  1. Central Control & Monitoring System
  2. Perimeter Fence Intrusion Detection System

RSAF / USAF Johnson Control

3.

Long Range Radar, RSAF
in Afif

Mar '90 -Sep. '90

  1. Central Control & Monitoring System
  2. Perimeter Fence Intrusion Detection System

RSAF / USAF Johnson Control

4.

Communication Network
Rawdah Compound

Oct. '90 - Feb. '91

  1. Telecom Network
  2. CATV System
  3. Programming

ABV Rock Group

5.

CATV Network
AT & T
Compound
In Riyadh

Oct. '90 - Dec. '90

  1. CATV Equipment's
  2. Cable Laying
  3. Termination
  4. Testing & Commissioning

AT & T

6.

CATV Network RSAF
in Riyadh

Nov. '90 -Mar. '91

  1. CATV Equipment's
  2. Cable Laying
  3. Termination
  4. Testing & Commissioning

RSAF WESA

7.

Telephone PABX
& CATV System Rabwah Compound

Dec.'90 -Apr. '91

Supply and Installation for

  1. Tel. PABX System
  2. CATV System
  3. Tel. Billing System
  4. Cable Network
  5. Programming

ABV Rock Group

8.

Communications Network

Jan '91- Aug. '92

  1. Telecom Network
  2. CATV System
  3. Fiber Optic Cable Network


RSAF
WESA

9.

University Press Center,
Imam University
In Riyadh

Oct '90 -Sept. '92

  1. Structure Work
  2. Electrical System
  3. Telecom System
  4. HVAC System
  5. Control System

Imam University Lucky Dev. Co.

10.

King Fahd Int'l. Airport (KFIA)
in Dammam

July '91 -Dec. '92

  1. Fee Parking Equipment Supply & Installation
  2. HVAC Control System
  3. Electrical Works

MODA / IAP
Sam Sung

11.

Assir Desalination Plant
in Assir

Aug '91-Mar. '92

  1. Labeling Works
  2. Replacement Work for Damaged GRP Pipes
  3. Site Clearance

 

SWCC KHIC


No.


Name of Project


Contract Period


Job Description


Client

12.

Telephone PABX & CATV System
Abha Compound
In Abha

Aug '91-Feb. '92

  1. Tel. PABX System
  2. CATV System
  3. Tel. Billing Systems
  4. Programming & Testing

ABV Rock Group

13.

Security, Fire Alarm & Tel. PABX System
ABV OFFICE BUILDING
In Riyadh

Nov '91-Apr. '92

  1. Access Control
  2. Alarm Monitoring
  3. Fire Alarm
  4. Burglar Alarm
  5. CCTV & CATV System
  6. Tel. PABX System
  7. Tel. Billing System
  8. Network for the above
  9. Programming & Testing

ABV Rock Group

14.

Communications Network
RSAF DHAHRAN USMTM Facilities

Nov.'91-Mar. '92

  1. Telecom Network
  2. CATV System

RSAF / USMTM
A T & T

15.

CATV & Tel. PABX Systems
Center Compound Riyadh

Feb '92- May '92

  1. CATV System
  2. Tel. PABX System
  3. Tel. Billing System
  4. Cable Networks

ABV Rock Group

16.

CATV & Tel. PABX System for Airport Village Compound Riyadh

Mar '92-Aug. '92

  1. CATV System
  2. Tel. PABX System
  3. Tel. Billing System
  4. Cable Networks

ABV Rock Group

17.

CATV System
CCC Camp, Medina

Mar '92-May '92

  1. SMATV System
  2. CATV System
  3. Cable Networks

ABV Rock Group

18.

CSF Project
Six Sectors : Riyadh, Al-Kharj, Dhahran, Taif Tabuk & Khamis

May '92Apr. '93

  1. LOS / MTN Tower Installation
  2. 29 Communications Towers

RSAF / USAF CRSS

19.

CSF Project Khamis Airbase

July '92-Dec. '92

  1. Erosion Protection Work for CSF Site
  2. 4HF2 Site & 4MW2 Site

RSAF / USAF CRSS

20.

KKIA, PF-503 Project
Riyadh

Feb. '93 -Jul. '95

  1. Fiber Optic Cable Network
  2. Tel. Cabinet Installation
  3. Splicing
  4. Power Substation
  5. Water Valve Box
  6. UPS

MODA / IAP
Lucky Co.


21.


SMATV System Riyadh


Mar '93 -Jun. '93

 

  1. Master Antenna TV System


ABV Rock Group

22.

LRR, N-17
Al-Ula

Mar '93-Dec. '93

  1. Power Line Network
  2. Building Electrical work
  3. Power Substation

RSAF / USAF CRSS Shinsung


No.


Name of Project


Contract Period


Job Description


Client

23.

SMATV System Riyadh

Nov. '92 July '93

  1. Master Antenna TV System

 

Abv Rock
Group
Site 1

24.

Intercom System Hamidi Office Bldg. Riyadh

Aug '93- Oct '93

  1. Intercom System for 7 Stories Building

ABV Rock Group

25.

Al-Baha Sports Center Project
In Al-Baha

Sept.¡¯93 Feb. ¡®94

  1. Replacement of Damaged Flood Lighting Masts
  2. Replacement of Flood Lighting Fixtures
  3. Flood Light Adjustment (Lux)

 

GPOYW
Shinsung

26.

PF - 503 / KFIA Infra Structure Facilities Project
in Riyadh

Apr '93-Sept. '94

  1. Electrical Substation
  2. Pipe Line Structures
  3. Fiber Optic Cable Network

 

MODA / IAP
Lucky Dev. Co.

27.

LDC Compound Project
in Riyadh

Sept '93-Mar. '94

7 Villas Construction

  1. Power Substation
  2. Electrical System
  3. Tel. System

Lucky Dev. Co.

28.

Qatif Sports Center Project
Qatif, Dammam

Apr. '94 - Jul. ¡®98

Supply & Installation for:

  1. Power Substation
  2. Power Distribution Boards
  3. Power Network
  4. Public Address System
  5. Fire Alarm System
  6. Telephone PABX System
  7. MATV System
  8. Earthing & Grounding
  9. Stadium Lighting
  10. BMS Networking
  11. Standby Generator

Youth Welfare
Shinsung

29.

Security Access Control System SSSP H. Q.
in Riyadh

Oct '94 -Mar. '95

 

  1. Security Access Control
  2. Photo ID Badging System
  3. Time Attendance System
  4. Parking Management System

MODA SSSP

30.

LRR, N-17
Long Range Radar Tower Erection Project
in Al-Ula



April '9-Dec. '95

  1. LRR Tower Erection
  2. HVAC System
  3. Electrical System
  4. Mechanical System
  5. Elevator Installation
  6. Fire Suppression (Halon) & Detection System
  7. Radome Erection

 

RSAF/
USAF HASI


No.


Name of Project


Contract Period


Job Description


Client

31.

LRR, N-4
Long Range Radar Tower Erection Project
in Tabuk




Jul '95- Feb. '96

  1. LRR Tower Erection
  2. HVAC System
  3. Electrical System
  4. Mechanical System
  5. Elevator Installation
  6. Fire Suppression & Detection System
  7. Fiber Optic Cable Network
  8. Radome Erection

RSAF / USAF
HASI

32.

Djibouti Public Housing Project
in Djibouti, Africa

Apr. '96 - Jul. ¡®97

Supply & Installation for:

  1. Electrical System
  2. Mechanical System
  3. 258 Villas and 1 Mosque

Djibouti
Authority
Al-Mobty

33.

Sheraton Hotel
Project
In Ethiopia



Oct. ¡¯97- Jul. ¡®99

  1. Tel. PABX System
  2. SMATV System
  3. Sound System
  4. Electrical System
  5. CCTV System
  6. Fiber Optic Cable Network

MIDROC Group

34.

CCTV System
Hughes Office Building
In Riyadh

Dec.¡¯97- Mar. ¡®99

  1. CCTV System for Perimeter Fens & Office Building

 

Hughes Arabia Ltd.

35.

New SSSP H. O.
Building
In Riyadh

Jul. ¡¯98 - Jun. ¡®99

Design, Supply and Installation for:

  1. Access Control System
  2. CCTV System
  3. B. M S.

SSSP
Saudi Abv

36.

Security System
SAMBA Buildings
In Riyadh, Al-Khobar

May¡¯99-Aug. ¡®99

  1. Access Control System

 

SAMBA

37.

SMATV System

Jan. ¡¯00-May ¡®00

  1. SMATV System Equipments

 

SSSP
Site 1

38.

Tel. & SMATV
System
Riyadh

Jan. ¡¯00-May ¡®00

  1. Tel. PABX System
  2. SMATV System
  3. Cable Network

 

Abv Rock
Group
EuroVilla

39.

Al-Barrak Residence Complex
In Riyadh

Sept.¡¯99- Jul.' '00

  1. Electrical Works
  2. Mechanical Works
  3. Testing & Commissioning

 

Al-Barrak

40.

Speed Post Service Project, In Riyadh

Oct. ¡¯99-Oct. ¡®00

  1. Security Access Control System

 

SPS

41.

Sultan Airbase
In Al-Kharj

Apr.¡¯00-Sept. ¡®00

Supply, Installation for

  1. LAN Equipments
  1. Fiber Optic Cable Network
  2. Power System
  3. Tel. System
  4. Partition Works

RSAF
HAL


No.


Name of Project


Contract Period


Job Description


Client

42.

GCC Technical

Support
Saudi, Oman
Bahrain, Qatar
Kuwait, U.A.E.

Mar. ¡¯00-Dec. ¡®00

  1. Tel. PABX Installation?
  2. PC Workstation
  3. MDF Installation
  4. Local Area Network (LAN)
  5. Fiber Optic Cable Network

GCC

Raytheon
Systems Inc., USA

43.

Mishary Hospital

Riyadh

Aug.¡¯00-Dec. ¡®00

  1. Burglar Alarm System
  2. CCTV System

 

Mishary

Hospital

44.

Security System Maintenance Project
3 Office Buildings in Riyadh

Sept.'93-Jun. ¡®01

  1. Access Control System
  2. CCTV Monitoring System
  3. Fire Alarm System

Tel. PABX System

Abv Rock
Group

45.

Sultan Air Base

Al-Kharj

Apr. ¡¯00-Oct. ¡®00

  1. Local Area Network (LAN)
  2. Fiber Optic Cable Work
  3. Power Supply Network

RSAF

HA L

46.

Royal Saudi Air Force Building (USMTM)

In Riyadh

Oct. ¡¯00-Oct. ¡®01

Maintenance for:

  1. HVAC System
  2. Buildings

RSAF, Hughes
Arabia Ltd. (HAL)

47.

Hughes Arabia Ltd. (HAL) In Riyadh

Dec.¡¯00-Jun. ¡®01

Security Access Control System

HAL

48.

Saudi American Bank

Head Office & Regional Buildings
in Riyadh, Jeddah, Dammam, Countrywide

Feb. ¡¯01-Dec. '02

Integrated Security Access Control & Alarm Monitoring System, Countrywide for:

  1. Head Office Building
  1. Riyadh Regional Building
  2. Kingdom Center Building
  3. Sitten Building
  4. Al-Khobar Regional Building
  5. Jeddah Faya Building

SAMBA

49.

Abv Rock Office Buildings

in Riyadh

Aug ¡¯02-Mar. ¡®03

Security System Maintenance for:

  1. Abv Rock Head Office Building
  2. Hamidi Executive Building

ABV Rock Group KB.

50.

SSSP Head Office Building

Aug.¡¯02- Sep ¡®03

Security System Maintenance for:

  1. SSSP Head Office Building

Saudi Strategic Storage Program (SSSP)

51.

Saudi Hollandi Bank Buildings: H.O. & D.Q. in Riyadh

Oct.¡¯02 - Dec. ¡®02

Fingerprint Access Control System

Saudi Hollandi Bank

52

L. M. Ericsson Office Buildings

In Riyadh, Jeddah & Dammam
Countrywide

Jul. ¡¯03 - Dec. ¡®03

Integrated Security & Safety System

  1. Access Control system
  2. Waist Height Turnstiles
  3. Fire Alarm System
  4. CCTV Surveillance System
  5. FM-200 Fire Suppression System

L. M. Ericsson


No.


Name of Project


Contract Period


Job Description


Client

53

Saudi American Bank
In Riyadh, Jeddah & Dammam

Sep.¡¯03-Dec. ¡®03

Supply & Installation for Security Waist Height Turnstiles

  1. Head Office Building
  1. Riyadh Regional Building
  2. Sitten Communications Bldg.
  3. Jeddah Regional Building
  4. Dammam Regional Building

Saudi American Bank (SAMBA)

54

Fingerprint Access Control Enhancement
Head Office & DQ Office Building

Dec.¡¯03 - Feb. ¡®04

Upgrade of Fingerprint Access Control System

  1. Build-Up Central Control Station
  1. Network Connection (WAN)

Saudi Hollandi Bank

55

Ar-Riyadh Development Authority in Diplomatic Quarter
Riyadh

Jan¡¯ 04 -Jun. ¡®04

Local Area Network (LAN)

  1. Supply & Installation of Local Area Network

British Telecom Company

56

SAMBA
Andalus Building
Jeddah

Mar. ¡¯04 Jun. ¡®04

Security Access Control System

  1. Supply & Installation of Access Control System

Saudi American Bank

57

L. M. Ericsson Middle East Head Office Buildings

In Olaya, Riyadh

Apr. ¡¯04 - Jul. ¡®04

Integrated Security & Safety System

  1. Access Control system
  1. Fire Alarm System
  2. CCTV Surveillance System
  3. FM-200 Fire Suppression System

L. M. Ericsson

58

L. M. Ericsson Training Center Building

In Riyadh

Apr. ¡¯04 - Jul. ¡®04

Integrated Security & Safety System

  1. Access Control system
  2. Fire Alarm System
  3. CCTV Surveillance System
  4. FM-200 Fire Suppression System

L. M. Ericsson

59

Saudi Hollandi Bank Head Office Building in Riyadh

Jun. ¡¯04 - Oct. ¡®04

Security Access Control System

  1. Bioscrypt Fingerprint Readers
  1. Waist Height Turnstiles

Saudi Hollandi Bank

60

Ericsson
New Head Office Building
Dana Compound
Riyadh

Nov. ¡¯04 - Apr. ¡®05

Integrated System Relocation of

  1. Access Control system
  2. Fire Alarm System
  3. CCTV System
  4. FM-200 Fire Suppression System
  5. Waist Height Turnstiles

L. M. Ericsson

61

O & M Service
Major Buildings
Countrywide

Jan. ¡¯05 -Dec. ¡¯07

On Going

O & M Service for

  1. Security Alarm System
  2. Fire Alarm & Fire Fighting
  3. CCTV System

SAMBA Financial Group

62

Hollandi Bank
Head Office Building

Nov.¡¯04- Feb. ¡®05

Security Access Control System
for Additional Bioscrypt Fingerprint Readers

Hollandi Bank


No.


Name of Project


Contract Period


Job Description


Client

63

Operation Service
Ericsson Office Buildings

Jan. ¡¯05- Dec. ¡¯05

Operation Service for Security & Safety System

L. M. Ericsson

64

CCTV System
SAMBA
Khobar Downtown BLDG

Feb. ¡¯05-Mar. ¡®05

New DVR & Cameras Installation

SAMBA Financial Group

65

Access Control System Centralization
SAMBA

Feb. ¡¯05-Mar. ¡®05

Centralization of Access Control System

SAMBA Financial Group

66

Access Control System SAMBA Jeddah
Andalus BLDG

Feb. ¡¯05-Apr. ¡®05

Elevator Access Control system

SAMBA Financial Group

67

Access Control &? Fire Alarm System
SAMBA Head Office BLDG

Feb. ¡¯05-Mar. ¡®05

Modification Works for Access Control & Fire Alarm System in 5th. Floor

SAMBA Financial Group

68

CCTV System
SAMBA Khobar
Regional Office BLDG

Feb. ¡¯05-Apr. ¡®05

CCTV System for New Car Park

SAMBA Financial Group

69

Fire Alarm System
SAMBA Jeddah
Faya Office BLDG

Feb. ¡¯05-Jul. ¡®05

New Fire Alarm System Works

SAMBA Financial Group

70

Access Control System
SAMBA Riyadh
Kingdom Tower BLDG.

Mar. ¡¯05-Apr.¡¯05

Access Control System Expansion

SAMBA Financial Group

71

Security & Safety System
Korea Embassy
Riyadh

Mar. ¡¯05-May 05

Security & Safety System

  • Perimeter Fence Protection Works
  • Security Door Protection Works
  • Intrusion Warning System

Korea Embassy

72

CCTV System
SAMBA Khobar
Regional Office Building

Apr. ¡¯05-May ¡®05

New Digital Video Recorders

SAMBA Financial Group

73

Access Control System
SAMBA Riyadh
Head Office BLDG

Apr. ¡¯05- May ¡®05

Additional Card Readers-Ground Floor

SAMBA Financial Group

74

Access Control System
SAMBA Riyadh
Kingdom Tower BLDG

Apr. ¡¯05-May ¡®05

Access Control System

  • Additional Control Panels
  • Additional Proximity Readers

SAMBA Financial Group

75

CCTV System
SAMBA Riyadh
Kingdom Tower BLDG

Apr. ¡¯05-May ¡®05

New Digital Video Recorders

SAMBA Financial Group

76

Security & Safety System
SAMBA Riyadh
Granada Branch

Apr. ¡¯05-Aug. ¡®05

Security & Safety System

  • Intrusion Detection System
  • Fire Alarm System
  • CCTV System
  • Access Control System

SAMBA Financial Group

77

Security & Safety System
SAMBA Madina
Sultana Branch
Madina

May ¡¯05-Jan. ¡®06

Security & Safety System

  • Intrusion Detection System
  • Fire Alarm System
  • CCTV System
  • Access Control System

SAMBA Financial Group


No.


Name of Project


Contract Period


Job Description


Client

78

CCTV Upgrading Works
SAMBA Head Office &
Riyadh Regional Office, Riyadh

Jun.¡¯05-Sep. ¡®05

CCTV System Upgrading Works with:

  • Color Dome Cameras
  • PTZ, Zoom, and Day & Night
  • Honeywell Fusion DVRs
  • Networking, Testing & Commissioning

SAMBA

Financial Group

79

Access Control System
Riyadh Regional Office
Riyadh

Jun.¡¯05-Jun.¡¯05

Access Control system

  • Control Panel
  • Proximity Card readers

SAMBA

Financial Group

80

Access Control System
Dana Office Building
Riyadh

Jun. ¡¯05-Aug. ¡®05

Access Control System Works

  • Additional Proximity Readers
  • Testing & Commissioning

L. M. Ericsson

81

Access Control System
Hollandi Bank
Head Office Building
Riyadh

Jul. ¡¯05-Aug. ¡®05

Access Control System

  • Additional Fingerprint Readers
  • Testing & Commissioning

Saudi Hollandi Bank

82

Security & Safety System
SAMBA Olaya Branch
Riyadh

Aug¡¯05-Aug. ¡®05

Security & Safety System

  • Intrusion Detection System
  • Fire Alarm System
  • CCTV System
  • Access Control System

SAMBA Financial Group

83

Security & Safety System
SAMBA Faya Branch
Jeddah

Aug. ¡¯05-Sep. ¡®05

Security & Safety System

  • Intrusion Detection System
  • Fire Alarm System
  • CCTV System
  • Access Control System

SAMBA Financial Group

84

CCTV Upgrading Works
SAMBA Regional Office Building
Jeddah

Sep.¡¯05-Jan. ¡®06

CCTV System Upgrading Works with:

  • Color Dome Cameras
  • PTZ, Zoom, and Day & Night
  • Honeywell Fusion DVRs
  • Networking, Testing & Commissioning

SAMBA

Financial Group

85

CCTV Upgrading Works
SAMBA Regional Office Building
Khobar

Sep.¡¯05-Feb. ¡®06

CCTV System Upgrading Works with:

  • Color Dome Cameras
  • PTZ, Zoom, and Day & Night
  • Honeywell Fusion DVRs
  • Networking, Testing & Commissioning

SAMBA

Financial Group

86

Security & Safety System
SAMBA Downtown Branch
Khobar

Sep. ¡¯05-Sep. ¡®06

Security & Safety System

  • Intrusion Detection System
  • Fire Alarm System
  • CCTV System
  • Access Control System

SAMBA Financial Group

87

Security & Safety System
SAMBA Nama Branch
Jeddah

Oct. ¡¯05-Jun. ¡®06

Security & Safety System

  • Intrusion Detection System
  • Fire Alarm System
  • CCTV System
  • Access Control System

SAMBA Financial Group

88

Security & Safety System
CAB Building
Riyadh

Dec. ¡¯05-Jul. ¡®06

Security & Safety System

  • Fire Alarm System
  • CCTV System
  • Access Control System

SAMBA Financial Group

89

Security System
L. M. Ericsson
Jeddah Office Building

Dec¡¯05-Aug. ¡®06

Security System

  • CCTV System
  • Access Control System

L.M. Ericsson

90

Saudi Hollandi Bank
Olaya Branch
Riyadh

Dec. ¡¯05-Jun. ¡®06

Security System

  • Fingerprint Access Control
  • System Networking (LAN/WAN)

Saudi Hollandi Bank

91

Security System
L. M. Ericsson
Makkah Office Building

Dec. ¡¯05-Jul. ¡®06

Security System

  • CCTV System
  • Access Control System

L. M. Ericsson

92

Saudi Hollandi Bank
Rashid Branch
Riyadh

Jan.¡¯05-Aug. ¡®06

Security System

  • Fingerprint Access Control
  • System Networking (LAN/WAN)

Saudi Hollandi Bank

93

CCTV System
Downtown Building
Khobar

Feb.¡¯06-Feb. ¡®06

CCTV System

  • Digital Video Recorder
  • Day & Night Dome Cameras

SAMBA Financial Group

94

Security & Safety System
TBS Hara Branch
Riyadh

Mar.¡¯06-Apr. ¡®06

Security & Safety System

  • Intrusion Detection System
  • Fire Alarm System
  • CCTV System
  • Access Control System

SAMBA Financial Group

95

Security & Safety System
Tabuk Branch
Tabuk

Mar. ¡¯06-Apr.06

Security & Safety System

  • Intrusion Detection System
  • Fire Alarm System
  • CCTV System
  • Access Control System

SAMBA Financial Group

96

Security & Safety System
Hofuf Branch
Hofuf

Apr. ¡¯06-May' 06

Security & Safety System

  • Intrusion Detection System
  • Fire Alarm System
  • CCTV System
  • Access Control System

SAMBA Financial Group

97

Saudi Hollandi Bank
Jeddah Regional Office
Jeddah

Mar¡¯06-Aug. ¡®06

Security System

  • Fingerprint Access Control
  • Security Turnstiles
  • System Networking (LAN/WAN)

Saudi Hollandi Bank

98

Saudi Hollandi Bank
Head Office & D. Q.
Riyadh

Apr.¡¯06-Sep. ¡®06

Security System

  • Fingerprint Access Control
  • System Networking (LAN/WAN)

Saudi Hollandi Bank

99

Security System Expansion
Dana Office Building
Riyadh

May¡¯06-Sep. ¡®06

Security System Expansion

  • Security Turnstiles
  • Access Control System
  • CCTV System

L. M. Ericsson

100

Security & Safety System
Sultan Street Branch
Jeddah

May¡¯06Nov. ¡®06

Security & Safety System

  • Intrusion Detection System
  • Fire Alarm System
  • CCTV System
  • Access Control System

SAMBA Financial Group

101

Security & Safety System
Technology Building
Riyadh

Jun. ¡¯06-Dec. ¡®06

Security & Safety System

  • Intrusion Detection System
  • Fire Alarm System
  • CCTV System
  • Access Control System

SAMBA Financial Group


No.


Name of Project


Contract Period


Job Description


Client

102

Security & Safety System
Takassushi Branch
Riyadh

Jul. ¡¯06-Aug' 06

Security & Safety System

  • Intrusion Detection System
  • Fire Alarm System
  • CCTV System
  • Access Control System

SAMBA Financial Group

103

Security & Safety System
Suleimaniya Branch
Riyadh

Aug. ¡¯06-Sept' 06

Security & Safety System

  • Intrusion Detection System
  • Fire Alarm System
  • CCTV System
  • Access Control System

SAMBA Financial Group

104

Security & Safety System
Quruban Branch
Madinah

Sept. ¡¯06-Nov. ¡®06

Security & Safety System

  • Intrusion Detection System
  • Fire Alarm System
  • CCTV System
  • Access Control System

SAMBA Financial Group

105

Security System Expansion
Dana Office Building
Riyadh

Aug.¡¯06-Dec. ¡®06

Security System Expansion

  • Security Turnstiles
  • Access Control System

L. M. Ericsson

106

New Platforms Project
Contract No.: SFC/756-500/086
Riyadh Refinery Plant

Oct. ¡¯06-Dec. ¡®06

  • Supply & Installation of New Platforms
  • Tanks Cleaning Works
  • Tanks Painting Works

 

Saudi Aramco

107

Riyadh Diesel Hydrotreater Project
Contract No.: SFC/756-200/143
Riyadh Refinery Plant

Nov.¡¯06-May ¡®07

Instrumentation Works for

  • Installation of Tank ¡®High-High¡¯ Level Transmitters
  • Radar Tank Gauging Works
  • Detectors & Sensors Installation
  • RSC Pipe Networking
  • Distribution Panels
  • Testing & Commissioning

Saudi Aramco

108

Saudi Hollandi Bank
Sahafat Branch
Riyadh

Oct. ¡¯07-Nov' 07

Security System

  • Fingerprint Access Control
  • Security Turnstiles
  • System Networking (LAN/WAN)

Saudi Hollandi Bank

109

CCTV Upgrading Project
Riyadh & Jeddah

Nov' 07-Dec' 07

CCTV Upgrading Works for:

  • Sitten Regional Office Building
  • Kingdom Tower Center
  • Faya Regional Office Building

SAMBA Financial Group

110

Saudi Aramco Project
Riyadh

Jan' ¡¯08-Mar' 08

Miscellaneous Works

  • North Riyadh Plant
  • Sulayle Plant
  • Qassim Plant

Saudi Aramco